Availability: | |
---|---|
Quantity: | |
Double Plug Clamp
Wisechannel
8431431000
Double plug Clamp Type Cement Head can accommodate level 2 rubber plug and cementing operations and is equipped with independent plug valve circulation manifold.
The quick-fitting joint design of the product allows for a wider range of connections. It can apply to cannula with different threads of the same specification, which is more convenient and reliable.
The product is designed with rubber plug dropping indicator, making it convenient for the operator to determine whether the rubber plug has passed.
Technique Parameters:
Model (mm) / (in) | I.D. (mm) | Height (mm) | Working Pressure (M Pa) | Length of the Upper Rubber Plug (mm) | Length of the Lower Rubber Plug (mm) | Manifold | ||
127 | 5 | 114.3 | 1620~1687 | 70 | 300 | 300 | 2"1502 | |
140 | 5-1/2 | 121.4 | 1620~1687 | 70 | 300 | 300 | 2"1502 | |
178 | 7 | 156 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
219 | 8-5/8 | 156 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
244 | 9-5/8 | 220 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
273 | 10-3/4 | 251 | 2010~2074 | 50 | 425 | 425 | 2"1502 | |
340 | 13-3/8 | 316 | 2010~2074 | 35 | 425 | 425 | 2"1502 | |
406 | 16 | 451 | 2210~2251 | 35 | 520 | 525 | 2"1502 | |
473 | 18-5/8 | 451 | 2210~2251 | 35 | 520 | 525 | 2"1502 | |
508 | 20 | 478 | 2210~2251 | 35 | 520 | 525 | 2"1502 |
The full range of specifications meet the requirements of SY / T7084-2016 standard. Q:How can I place order?
A: You can contact us by email or social media like WhatsApp on the order detail or place order on line.
Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.
Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.
Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.
Q: How do you deal with defective products received by the clients?
A: If there are some defective items, we usually credit to our customer or replace them in next shipment.
Double plug Clamp Type Cement Head can accommodate level 2 rubber plug and cementing operations and is equipped with independent plug valve circulation manifold.
The quick-fitting joint design of the product allows for a wider range of connections. It can apply to cannula with different threads of the same specification, which is more convenient and reliable.
The product is designed with rubber plug dropping indicator, making it convenient for the operator to determine whether the rubber plug has passed.
Technique Parameters:
Model (mm) / (in) | I.D. (mm) | Height (mm) | Working Pressure (M Pa) | Length of the Upper Rubber Plug (mm) | Length of the Lower Rubber Plug (mm) | Manifold | ||
127 | 5 | 114.3 | 1620~1687 | 70 | 300 | 300 | 2"1502 | |
140 | 5-1/2 | 121.4 | 1620~1687 | 70 | 300 | 300 | 2"1502 | |
178 | 7 | 156 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
219 | 8-5/8 | 156 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
244 | 9-5/8 | 220 | 2010~2080 | 50 | 425 | 425 | 2"1502 | |
273 | 10-3/4 | 251 | 2010~2074 | 50 | 425 | 425 | 2"1502 | |
340 | 13-3/8 | 316 | 2010~2074 | 35 | 425 | 425 | 2"1502 | |
406 | 16 | 451 | 2210~2251 | 35 | 520 | 525 | 2"1502 | |
473 | 18-5/8 | 451 | 2210~2251 | 35 | 520 | 525 | 2"1502 | |
508 | 20 | 478 | 2210~2251 | 35 | 520 | 525 | 2"1502 |
The full range of specifications meet the requirements of SY / T7084-2016 standard. Q:How can I place order?
A: You can contact us by email or social media like WhatsApp on the order detail or place order on line.
Q:How about the payment?
A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection.
Q:How can I pay you?
A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the PI, you can make the payment through your bank as per the terms mentioned in PI.
Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.
Q: How do you deal with defective products received by the clients?
A: If there are some defective items, we usually credit to our customer or replace them in next shipment.